| STRUCTURE
Frame
structure:
RCC
External
walls:
8” thick concrete blocks
Internal
partition walls:
4” thick concrete blocks
Internal
plastering: Cement Mortar,
Rendered
With the slaked lime
External
plaster: Cement Mortar
FLOOR AND DADOING
Flooring
for office area:
No Flooring
Flooring
for Toilet Area:
Ceramic Tile / Vitrified Tile.
Dadoing
in the Toilet:
Ceramic Glazed Tile / Granite for
dado up to False Ceiling @ 2400mm
FLOORING IN OTHER
AREAS
Balcony:
Eurocon Tiles
Entrance
Lobby:
Granite Flooring, Vitrified Tiles
with Dado
Common
Lobbies on Upper Floor:
Granite flooring, Vitrified Tiles
with dado
Staircase:
Main Staircase - Granite, Others -
Kota Stone |
Basement:
Cement concrete (IPS) flooring
ELECTRICAL
HT Supply:
11KV HT
Circuit
Breakers:
Over lead protection and earth leakage
Circuit Breakers provided
Conduit:
Concealed wiring through PVC conduits
wherever required or open conduiting.
Power
Supply:
1KVA per 100sq ft (2 Nos 1250 Kva
Transformers)
Back-up:
Diesel Generator with 1 KVA per 100
Sq ft.(3 Nos 1010 Kva DG's)
COMMON SERVICE
Lift:
3 nos 16 passenger lift & 1 Freight
lift (1500 Kg)
Municipal
Water Supply:
Municipal Water Supply from CWSSB/
Bore Well.
Sewage
Disposal:
Sewage treatment plant
Car
Parking:
Covered/Surface Parking
Water
Tanks:
RCC underground and overhead tanks
for fire and Domestic of suitable
capacity. |
TELEPHONES
Telephone
Exchange:
Communication rooms provided with
conduit from main road.
FIRE PROTECTION SYSTEM
Fire protection system consisting
of External Hydrants, Sprinklers in
Basement & Common Areas, Tap off
for Office Sprinklers, Wet Risers
etc. Fire Protection System as per
NBC 2005.
PAINTING
Internal
surface of walls :
OBD for Service Areas, Acrylic Emulsion
in Corridors, Lobby and Putty finish
inside Office Areas.
External
surface of walls:
Aluminium Composite Panel, Stone Cladding
and Texture Finish.
No plastering on ceiling
HIGH SIDE
AIR-CONDITIONING SYSTEM
Suitable capacity chillers and AHU's
(Except internal ducting) with required
electrical panels will be provided.
Chilled water supply will be at 7
degree C.
|